Services — Tool preparation inside your plant

Pre-Setting

We assemble and pre-set tools inside your plant. The tool reaches the machine measured, identified and ready to run.

Tool preparation inside your plant

A badly assembled tool on the machine means downtime or a broken tool. Every assembly change made on the machining centre itself burns spindle time, depends on operator availability and introduces dimensional variation from one assembly to the next.

With Pre-Setting, Kromi installs a preparation cell inside your plant. Assemblies are built and measured off the machine, on a presetter, with actual length and diameter values recorded and transferred to the control.

The machine receives the assembly ready, identified and with known offsets. Setup stops being trial and error and becomes a plug-in operation.

  • Pre-Setting 1
  • Pre-Setting 2
  • Pre-Setting 3
  • Pre-Setting 4

What we deliver

  • A cell designed for your plant

    A solution developed around the needs, processes and characteristics of each operation.

  • Equipment and technology specification

    Selection of the equipment and technology needed to ensure precision, speed and efficiency in tool preparation.

  • Design and construction management

    Design of a functional, organised environment, focused on the best flow of people, tools and information.

  • Processes and operating standards

    Definition of flows, procedures and working standards, including 5S and organisation principles.

  • Operator training

    Training the team to use the equipment and run the processes in a standardised, efficient way.

  • Sister-tool mapping and stock management

    Sizing and organising sister tools, ensuring availability and tighter control of resources.

  • Data and indicator management

    Structuring operational data and indicators for greater control and visibility.

  • Follow-up and continuous improvement

    Following the operation after go-live, spotting opportunities and driving continuous improvement.

The tool flow in Kromi Pre-Set

More than preparing tools, Kromi Pre-Set organises, controls and optimises the whole cycle. The goal is that every assembly reaches the machine in the right condition, at the right moment and with the information needed to produce.

  1. 01

    Condition assessment

    The operator assesses the condition of the tool. If it is still fit for use, it goes back into the process, avoiding needless replacements and cutting cost.

  2. 02

    Stripping, cleaning and preparation

    When the tool has to be replaced, the assembly is stripped, cleaned and prepared. The condition of components and accessories is checked to ensure correct assembly.

  3. 03

    Regrinding cycle management

    Where applicable, the tool enters the regrinding management flow. Its cycle is tracked to reduce consumption of new tools.

  4. 04

    Component stock management

    Managing components ensures availability for assembly and stops a single missing item from interrupting the tool flow.

  5. 05

    Measurement and setting on dedicated equipment

    The assembled tool is set and measured on measuring equipment. Its main dimensions are checked to ensure precision and repeatability in machining.

  6. 06

    Data ready for the CNC machine

    A physical label is generated with the tool's main dimensions, allowing quick transfer to the CNC control, reducing errors and speeding up machine setup.

  7. 07

    Tool control and traceability

    Every tool assembly gains a controlled history, allowing sharper decisions about its life cycle.

  8. 08

    Return and availability for production

    The process ends where productivity begins: with the tool ready to go into the machine.

A tool is only replaced when the assessment says its life is over — and every assembly carries its own history, from the first setting to disposal.

Benefits

  • More spindle hours

    Setup moves out of the machine.

  • Less scrap on first lot

    Correct offsets from the first part.

  • Predictable setup

    Same assembly, same result, any operator.

  • Tool life preserved

    Controlled assembly reduces premature breakage.

How we contract

One service, or all of them

The four fronts work together. You choose which ones go into the contract as your plant needs them — and what changes is not only the scope: it is having one point of contact, one invoice and the same management method over all of it.

Most common combinations

    • Tool Management
    • MRO Management
    • PPE Management
    • Pre-Setting

    Tool Management + Pre-Setting

    For plants with frequent assembly changes that want setup out of the machine.

    • Tool Management
    • MRO Management
    • PPE Management
    • Pre-Setting

    Tool Management + PPE

    Tooling in the KTC and PPE in the KS: two distinct machines, the same management and the same record behind them.

    • Tool Management
    • MRO Management
    • PPE Management
    • Pre-Setting

    MRO + Tool Management + PPE

    All the plant's indirect supply under a single management, traceable end to end.

    • Tool Management
    • MRO Management
    • PPE Management
    • Pre-Setting

    Complete management

    All four fronts integrated: from buying the tool to the assembly ready at the machine.

Explore the Kromi solutions

Shall we calculate how much your operation can save?

A specialist reviews your current consumption scenario and presents the reduction potential before any commitment.